FIDIC Conditions of Contract Orange Book for Design Build and Turnkey The object of this FIDIC Conditions of Contract Orange Book for Design Build and Turnkey is to comment on the provisions contained in Part 1 of the first edition of the “Conditions of Contract for Design-Build and Turnkey”. Informally titled “the Orange Book”, it was published by the Federation Intemationale des Ingenieurs-Conseils (FIDIC) in 1995.

FIDIC Conditions of Contract Orange Book for Design Build and Turnkey, A Test Edition had been published in 1994, and the many reactions to it were reviewed before the first edition was completed.

This FIDIC Conditions of Contract Orange Book for Design Build and Turnkey (informally titled “the Orange Book Guide”) is intended to assist the users of the Orange Book, namely those who write, and those who administer, contracts based on these Conditions of Contract.

This assistance is focused on particular features of the Orange Book : the Guide is not intended to provide complete training material for the expertise required for the preparation of tender documents. Also, the comments are not intended to provide an authoritative legal interpretation of every aspect of each subject, which must depend on the law applicable to the particular contract.
It is envisaged that the Orange Book can be the basis of all contracts which involve the provision of facilities designed by the Contractor, whether such facilities comprise building, civil engineering, chemical engineering, electrical engineering, mechanical engineering, or any combination, fidic orange book fidic website fidic training procedury fidic fidic courses fidic course studia podyplomowe fidic training courses. Throughout the drafting, the intention was to incorporate provisions applicable to (for example) housing, roads, refineries, generators, turbines, treatment works, etc. However, the Orange Book is not appropriate for the provision of facilities designed by the Employer or his consulting engineer, or for similar arrangements where the Contractor is not to be responsible for design. fidic orange book, fidic website, fidic training, procedury fidic, fidic courses, fidic course,  studia podyplomowe fidic, fidic training courses

Project Procurement – the Design-Build Option, FIDIC Conditions of Contract Orange Book for Design Build and Turnkey
Under the Orange Book design-build form of contract, design is the responsibility of the construction organization. This arrangement reduces the problems which may on occasions arise from the division of responsibility between designer and constructor. Design-build may also encourage economies, not only in terms of price, but at the expense of quality. Therefore, it is considered essential that the Employer has (or procures) expert technical services, in order to ensure that his requirements are elaborated in the tender documents and are achieved in practice. If expertise is unavailable, problems may arise, particularly in respect of the need for variations.

Ideally, variations under a design-build contract should be instructed by reference to requirements (not by a redesign by the Employer); and their costs and other consequences should be agreed in advance, in order to minimize disputes. In practice, these aspects can make the design-build process appear somewhat inflexible. The design-build process is thus less amenable to variations initiated by the Employer, compared with the alternative where the designer is separately employed by the Employer and is independent of the Contractor.

FIDIC Conditions of Contract Orange Book for Design Build and Turnkey, The design-build option prevents the Employer from having a close involvement in the design process. However, it enables him to have the benefits of lump-sum pricing, of the Contractor’s undivided liability for the works (including design), and of the potential savings (in cost and time) due to a degree of overlap of design and construction. The latter overlap may (or may not) lessen the total period between the commencement of the preparation of tender documents and the completion of construction. The saving in time due to this overlap may be offset by the effects of the lack of continuity of the design processes during the pre-contract stages. fidic orange book fidic website fidic training procedury fidic fidic courses fidic course studia podyplomowe fidic training courses.

Download Type :  PDF File, FIDIC Conditions of Contract Orange Book for Design Build and Turnkey

FIDIC Conditions of Contract Orange Book for Design Build and Turnkey Pdf :


Download PDF File



Tags : tvtc distance learning, Tvtc zambia